Pipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid Additive

Product Details
Customization: Available
Appearance: Black Gray Powder
Fineness (20 Mesh Screen Residue): Less Than 10%
Still deciding? Get samples of $ !
Request Sample
Gold Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
R&D Capabilities
The supplier has 4 R&D engineers, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO14001
ISO45001:2018 certificate
ISO9001:2015 certificate
to see all verified strength labels (11)
  • Pipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid Additive
  • Pipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid Additive
  • Pipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid Additive
  • Pipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid Additive
  • Pipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid Additive
  • Pipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid Additive
Find Similar Products

Basic Info.

Model NO.
DFS10-002
Transport Package
25kg Sack
Specification
25kg
Trademark
BHAFREE
Origin
China
Production Capacity
5000 Mt Per Year

Product Description

Product Description

BHAFREE® is black gray powder pipe-freeing agent made of asphalt, surfactants and organic clay. It can be mixed in diesel or mineral oil with water to rapidly create an invert emulsion to wet and lubricate the drillstring and reduce the force required to free stuck pipe. BHAFREE® dehydrates and cracks filter cakes, allowing the spotting fluid to penetrate between the drillstring and the formation. BHAFREE® is easily and quickly mixed, requiring no special rig or mixing equipment. It is preferred when a weighted soak solution is desired to match the system density. No limitation of soaking time keeps a high success rate of pipe-freeing.  

Applications/Functions

  • Formulate a soaking pill to release differential stuck pipe
  • Applicable for adhesion stuck issues
  • Treat out stuck pipe issues in undergauged / tight hole

Advantages

  • High success rate of pipe-freeing
  • Adjustable weight of spotting pill: 0.95 - 2.00 sg
  • Good emulsion and suspension stability
  • Good thermal stability, no precipitation for 24 hours after aging at 150°C
  • Quite low filtration loss, can be easily pumped

Typical Properties

  • Appearance: Black gray powder
  • Fineness (20 mesh screen residue): less than 10%

Recommended Treatment

Spotting Fluid Formulation for 100 bbl (16m3)
SG, g/cm3  Diesel, m3 BHAFREE®, MT water, m3 O/W ratio Barite, MT
1.10 10.0 4.1 2.5 80/20 3.0
1.20 9.6 4.0 2.4 80/20 3.7
1.30 9.3 3.9 2.3 80/20 7.2
1.40 9.0 3.7 2.2 80/20 9.3
1.50 8.7 3.6 2.2 80/20 11.4
1.60 8.4 3.5 2.1 80/20 13.6
1.70 8.1 3.3 2.0 80/20 15.5
1.80 7.7 3.2 1.9 80/20 17.6
1.90 7.4 3.1 1.9 80/20 18.9
2.00 7.1 3.0 1.9 80/20 21.8

Package

  • 25 KG SACK

Mixing Procedure

  • Clean the spotting tank. Flush the mixing line with water and drain.
  • Add the required amount of oil, BHAFREE® and water cover 150% of the stuck zone. Shear with centrifugal pump for 30 mins minimum until a stable emulsion formed.
  • Add weighting agent until the required density is achieved. It is preferred to weight up the spotting fluid above circulating mud 0.03-0.05SG. The Adjust the viscosity of spotting pill by adding diesel or water.

Spotting Procedure

  1. Determine the amount of BHAFREE® spot required to fill the annular space around the drillstring from the bit to the differentially stuck zone. To this circulation volume, add at least 25%. The extra volume remains inside the drillstring to allow for the periodic displacement of additional spotting fluid.
  2. Determine the proper pumping time to spot the fluid across the affected area. Displace, then shut off the pumps.
  3. Work the pipe regularly and use jars if possible. Displace 0.5-1bbl (80-160L) of BHAFREE® spot pill every 30 mins to keep the pipe covered.
  4. When the pipe is freed, the spotting fluid should be circulated out and caught in a tank to segregate from active mud.

 

Pipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid Additive
Pipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid AdditivePipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid AdditivePipe Freeing Agent-Black Gray Powder Pipe-Freeing Agent-Drilling Fluid Additive

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier